Local News | News

Cone Zone: Road Work for Week of May 11 – 17, 2014

KCBA News
May 12, 2014 11:14 am

MONTEREY COUNTY – Here are the major scheduled road and lane closures for Monterey County from Sunday, May 11, through Sunday, May 18, 2014 – newest information is in red. Please keep in mind that construction work is weather-dependent.

 

Highway 1 – Big Sur Coast: May 12 – May 16

  • Daytime drainage work and vegetation spraying along Highway 1 between Lime Creek Bridge and Garrapata Creek Bridge from 8 a.m. to 3 p.m.
  • Motorists can expect delays of approximately 10 minutes.

 

Highway 1 – Big Sur Coast AMGEN Bike Tour: May 14

  • Stage Four of The Amgen Tour of California Bicycle Race will move along Southbound Highway 1 from Monterey to Cambria on Wednesday, May 14.
  • The cyclists will leave the Monterey area heading south on Highway 1 at approximately 12 noon, and reach Cambria at approximately 3:30 pm.
  • The CHP will oversee these rolling highway closures for this event.
  •  Caltrans will post electronic message signs and assist with traffic control so motorists are aware of the cyclists and support vehicles.
  • The public may learn more about this event at:   http://www.amgentourofcalifornia.com/

 

Highway 1 – Monterey to Santa Cruz County Line: May 12 – May 16

  • Night time striping work on 10 bridges along Highway 1 from 8 p.m. to 7 a.m.
  • The locations are:
    • Southbound Highway 1 at Munras Ave. in Monterey
    • Southbound Highway 1 onramp at the Fremont St. in Monterey
    • Southbound Highway 1 at the Lake Drive Overcrossing in Marina
    • Southbound Highway 1 at the Lapis Spur overcrossing between Marina and Castroville
    • Southbound Highway 1 at the Pajaro River bridge near Watsonville

Highway 68 – Pacific Grove: May 15

  • Daytime paving on Highway 68 between Syida Drive and Samuel F B Morse Drive from 9 a.m. to 2 p.m.
  •  Motorists can expect delays of approximately 10 minutes

 

Highway 68 – Monterey: May 12 – May 16

  • Night time utility work on Highway 68 between Josselyn Canyon Road and Torero Drive from 8 p.m. to 5 a.m.
  • Motorists can expect delays of approximately 5 minutes.

Highway 101 – King City: May 12

  • Nighttime bridge work along northbound Highway 101 between Broadway and Jolon Road from 8 p.m. and 5:30 a.m.
  • Motorists can expect delays of approximately 10 minutes.

Highway 156: Prunedale-Castroville: May 16

  • Daytime vegetation spraying along eastbound and west bound Highway 156 between Vierra Canyon Road and Highway 1 from 5 a.m. to 7 a.m.
  • Motorists can expect delays of approximately 10 minutes.

Highway 101 – Prunedale Improvement Project: May 12 – May 16

  • Night time construction on Highway 101 will result in temporary closures of Highway 101 at the Crazy Horse Canyon Road Overpass with traffic shifted onto the on-ramps and off-ramps between the hours of 8:30 p.m. and 5:30 a.m.
  • The closures will only affect one direction each night.
  • The closures are:
    • Monday, May 12: Southbound Highway 101: southbound traffic to use interchange ramps.
    • Tuesday, May 13: Northbound Highway 101: northbound traffic to use interchange ramps.
    • Wednesday, May 14: Southbound Highway 101: northbound traffic to use interchange ramps.
    • Thursday, May 15: possible closures. Update next week.
  • Flaggers will be in place to control traffic and allow drivers to access Crazy Horse Canyon Road and Echo Valley Road.
  • The lane closures are necessary to allow crews to install new drainage for the highway.
  • Motorists should expect delays and plan for extra travel time. 

Comments